Our main Customer Service Centre has moved to 15 Hopetoun Street, Bendigo. Click here for more information.

Works Within Road Reserve (Vehicle crossing / Nature strip landscaping) application form

Leave feedback

Enquiries to 03 5434 6370 or [email protected]

Fee:$88.90 (current 1/7/2019 - 30/6/2020)

An invoice will be generated to the applicant after a permit is issued. You may be charged twice if payment is made before you receive an invoice as these payments cannot be tracked

Applicant Details

Postal Address*
Select the role that best describes you*

Details of the work

Please select*
Start Date
End Date
*Note: Unless under exceptional circumstances, permits will not be issued for longer than one month
Address of works*
Stormwater within 1 metre of vehicle crossing ?*
Any trees within 2 metres of vehicle crossing ?*
Gas/Water conduit in the vicinity of vehicle crossing ?*

Items to attach:

Sketch Plan: A copy of a sketch plan (may use house plan, neat hand drawn plan, etc…) showing the proposed work and all assets within the vicinity must be provided. Assets include all trees, landscaping, road pavement, kerb & channel, footpaths, drains, service authority assets and private assets.

No File Chosen
File uploads may not work on some mobile devices.

Works manager details

Works managers address
If details are not provided, consent will not be granted
Expiry date of the policy*
You must provide this information

Works manager responsibilities:

1) An infrastructure manager or a works manager must have regard to the principles specified in this clause in the provision of non-road infrastructure on roads.

2) The primary purpose of a road is use by members of the public and authorised users must be managed as far as is reasonably practicable in such a way as to minimise any adverse impacts on primary purpose.

3) Without limiting the generality of sub-clause (2), authorised users must be managed so as to -

a. minimise any damages to roads and rail infrastructure;

b. ensure the works necessary for the provision of non-road infrastructure are conducted as quickly as practicable;

c. minimise any disruption to road users;

d. minimise any risk to the safety and property of road users and the public generally;

e. facilitate the design and installation of infrastructure which minimises any risk to the safety of road users;

f. ensure that the road and any other infrastructure is reinstated as nearly as practicable to the condition existing before the works necessary for the provision of the non-road infrastructure were conducted;

g. protect and preserve existing significant roadside vegetation and sites of biological significance within the road reserve.

(Road Management Act - Schedule 7, Sec 14)

We welcome your feedback.

Did you know you can log requests online?

This includes several bin requests such as missed bins, footpath maintenance, tree inspections and general requests. Visit our make a request page.


Name*
Do you want us to contact you?*
Preferred contact method*