Draft Design Plans

Leave feedback

The below projects are being considered for future budgets.

The Engineering Department are seeking feedback on the plans from effected residents.

Allingham St Drainage Plans

Works are between Hattam St and # 109 Allingham St

Carolyn Way Drainage Renewal Plans

Works are between Emmaline Drive and Monsants Road.

466 Olympic Pde Drainage Plans

Install pipe through #466 to Creek beside Calder Highway

Davey Close Drainage Plans

Construct new pipe and large SEP's

Shearers Run drainage

4 Shearers Run to Calder Hwy - Upgrade pipe to 450 and install 2 EKIs

Lily Street Footpath Plan

East side - Rowan St to Mackenzie St

Greenwood Drive drainage upgrades

3 Greenwood Dr - 5 Greenwood Dr - Upgrade 1 SEP to EKI and Upgrade pipes

Monsants Rd Drainage

Upgrade Box Culvert in East table drain - 11 Monsants to Calder Hwy

Contact us

If you have received  correspondence directing you to this page, please provide any feedback using the contact details provided within the letter.

Other general Engineering enquires can be directed to 03 5434 6000 or [email protected]

We welcome your feedback.

Did you know you can log requests online?

This includes several bin requests such as missed bins, footpath maintenance, tree inspections and general requests. Visit our make a request page.


Name*
Do you want us to contact you?*
Preferred contact method*